Production Performance of Oil & Natural Gas Sector for the month of November, 2014



Production Performance of Oil & Natural Gas Sector for the month of November, 2014 
1.       A. CRUDE OIL PRODUCTION  – PERFORMANCE

Month / Period
Planned Target (TMT)
Actual Production (TMT)
%age achievement
Surplus(+) Shortfall(-) Vis-à-vis target (%age)
Surplus(+) Shortfall(-) over last year   (%age)
November, 2014*
3198.457
3143.101
98.3
-1.7
-0.1
April,2014-November, 2014*
25883.795
24961.773
96.4
-3.6
-0.8
April,2013-November, 2013

25166.528




TMT: Thousand Metric Tonnes.  *: Provisional.
B. COMPANY-WISE ACHIEVEMENT
Company / State
Planned Target (TMT)
Actual Production (TMT)
%age achievement
Surplus(+) Shortfall(-) (%age)
ONGC
1967.595
1861.935
94.6
-5.4
 Gujarat
401.052
374.813
93.5

 Andhra Pradesh
19.660
19.812
100.8

  Tamil Nadu
19.944
18.030
90.4

 Assam
105.010
86.284
82.2

Offshore
1421.929
1362.996
95.9

OIL
302.550
285.374
94.3
-5.7
  Assam
301.787
284.865
94.4

 Arunachal Pradesh
0.763
0.509
66.7

PRIVATE/JVC
928.312
995.792
107.3
7.3
TOTAL
3198.457
3143.101
98.3
-1.7
C. REASONS FOR SHORTFALL
Company / State
Reasons for shortfall
ONGC 
(offshore)
Low gas injection pressure, de-optimization, less gain from marginal field development & side track wells affected production. Delay in commencement of production from  WO16 cluster. Restricted production due to clamping of sub-sea lines. Less production from B 193 cluster due to less than envisaged production from few wells.
ONGC 
(Gujarat)
More than envisaged decline of base potential in Kalol, Ahmedabad & Limbodara fields and closure of wells due to less off-take by M/s. GAIL affected production. Aging of fields, declining of reservoir pressure, increasing water cut trend, GEB shutdown affected production.
ONGC 
(Assam)
Poor influx, low gas injection pressure affected production.
ONGC 
(Tamil Nadu)
Closure of wells due GAIL pipeline incident affected the production.
OIL
(Assam &Arunachal Pradesh)
Un-expected rise in water oil ratio/ gas oil ratio in few high productive wells viz Baghjan Field (4 wells) and Kamkhat ( 1 well).  Consequential major effect of (i) 48 Hr. "OIL Blockade" by Works Contract Labours (WCLs) on 24.11.2014 and (ii) 168 Hr. "OIL Block by Krishak Mukti Sangram Samittee (KMSS) on 26.11.2014.
Pvt/JVCs  (Arunachal Pradesh)
Repeated sand ingress in well requiring frequent well shut-in for well intervention.
Pvt/JVCs  (Gujarat)
Increasing water cut in existing wells in CB-ONN-2000/1 & CB-ON/3 field. Bottom hole pressure is going down in the Single Producing well S-1A Well producing more water than oil.

A statement showing Crude Oil Production during November, 2014 and
 cumulatively for the period April,2014- November, 2014 vis-à-vis 2013-14
 is at Annexure-I.
II.        A.  NATURAL GAS PRODUCTION PERFORMANCE
Month / Period
Planned Target (MCM)
Actual Production (MCM)
%age achieve-ment
Surplus(+) Shortfall(-) Vis-à-vis target    (%age)
Surplus(+) Shortfall(-) over last year     (%age)
November, 2014*
3016.569
2810.329
93.2
-6.8
-2.9
April,2014-November, 2014*
24206.182
22434.653
92.7
-7.3
-5.3
April,2013-November, 2013

23695.914



MCM: Million Cubic Metres.        




*: Provisional.


B.     COMPANY-WISE ACHIEVEMENT
Company / State
Planned Target (MCM)
Actual Production (MCM)
%age achievement
Surplus(+) Shortfall(-) (%age)
ONGC
1977.164
1845.545
93.3
-6.7
  Gujarat
113.899
120.098
105.4

  Rajasthan
1.280
0.727
56.8

  Andhra Pradesh
82.954
30.145
36.3

  Tamil Nadu
113.784
89.324
78.5

  Assam
37.728
36.599
97.0

  Tripura
115.993
104.147
89.8

Mumbai
 High Offshore
1511.527
1464.505
96.9

OIL
240.988
233.476
96.9
-3.1
  Assam
217.938
214.610
98.5

Arunachal Pradesh
1.950
1.000
51.3

  Rajasthan
21.100
17.866
84.7

PRIVATE/JVC
798.417
731.308
91.6
-8.4
  Onshore $
147.604
119.014
80.6

  Offshore
650.813
612.294
94.1

TOTAL
3016.569
2810.329
93.2
-6.8
$: Including Coal Bed Methane production.
C.     REASONS FOR SHORTFALL
Company / State
Reasons for shortfall
ONGC (Rajasthan)
Less offtake by consumers.
ONGC (Andhra Pradesh & Tamil Nadu)
Closure of wells due GAIL pipeline incident affected the production.
ONGC (Assam & Tripura)
Less offtake by consumers.
ONGC (Offshore)
Less than envisaged production from Baseein field.
OIL (Assam, Arunachal Pradesh & Rajasthan)
Less than the committed daily withdrawal by gas customers. Frequent shutdown of the old vintage gas turbines of the sole customer M/s  RRVUNL caused low withdrawal during the month.
Pvt/JVCs  (West Bengal)
Prolonged dewatering in new wells.
Pvt/JVCs  (Madhya Pradesh & Jharkhand)
Incidental CBM gas being produced in small quantities
Pvt/JVCs  (Off-shore)
Ma-8 well closed for 24 hours on 16/11/2014 for build-up study. MA-6H well underperforming. Four Wells in MA field are closed due to water loading and 10 wells in D1 & D3 gas fileds are closed due to higher water cut and sand ingress. Less Condensate production due to well integrity issues & water loading of wells.

III.  A. REFINERY CRUDE THROUGHPUT
 (IN TERMS OF CRUDE OIL PROCESSED)
Month/ Period
Planned Target
(TMT)
Actual Production (TMT)
%age achievement
Surplus(+) Shortfall(-)
Vis-à-vis target            
(in %age)
Surplus(+) Shortfall(-)
over last year         
 (in %age)
November, 2014*
17845.402
19205.050
107.6
7.6
8.1
April,2014-November, 2014*
148050.104
147003.093
99.3
-0.7
-0.5
April,2013-November, 2013

147761.531




*: Provisional.

Note:

The crude throughput in IOC (Guwahati, Barauni, Haldia & Bongaigaon ),
BPCL (Mumbai & Kochi), HPCL(Mumbai & Visakh), NRL, (Numaligarh),  
 ONGC (Tatipaka), HMEL (GGSR), BORL (Bina), EOL (Vadinar) and RIL
(Jamnagar DTA )  refineries have exceeded their planned target. Crude
throughput in IOCL (Guwahati & Barauni) is higher than the planned production
 due to deferment of planned shutdown.

The crude throughput in  IOC (Gujarat, Mathura, Digboi & Panipat),
CPCL (Manali & CBR), MRPL (Mangalore) and RIL (SEZ) refineries
was less than their planned target.

Company / State
Reasons for shortfall
IOCL, Gujarat
Throughput is lower due to problem in HGU.
IOCL, Mathura
Throughput is lower due to modification & hook jobs in FCCU.
IOCL, Panipat
Throughput is lower due to online spalling jobs in Coker unit.
IOCL, Mathura
Throughput is in  line with black oil demand.
MRPL, Mangalore
Delay in completion of the Phase 3 CPP by M/ S BHEL ,  inturn resulting delay in  commissioning and stable operations of Phase 3 PFCC & DCU units.
CPCL , Manali
Low asphalt dispatch due to monsoon month. Hence thruput optimised to reduce FO.
CPCL , Narimanam
Lower due to reduced availability of crude.

A statement showing refinery-wise production during the month
of November, 2014 and cumulatively for the period April,2014-
November, 2014 vis-à-vis 2013-14 is at Annexure-III.
IV.  REFINERY CAPACITY UTILISATION
Month
Utilisation (%)
Period
Utilisation (%)


November, 2014*
108.6
November, 2013- November, 2014
102.2


November, 2013
100.5
November, 2012- November, 2013
102.8


The refinery-wise details of the capacity utilisation during November, 2014 and
 cumulatively for the period April, 2014 - November, 2014 vies-a-vies 2013-14
are given in Annexure-IV.